Blog Layout

Ductile Iron Pipes Along Thompson Mill Rd

Zackary Murray • Aug 07, 2023

Case Study: Successful Installation of Ductile Iron Pipes Along Thompson Mill Rd

Project Overview:

Location: Thompson Mill Rd, DeKalb County

Total Pipe Length: 10,760 LF

Pipe Sizes: 8" and 12" Ductile Iron Pipe

Scope: Installation of 710 LF of 8" DIP, 10,050 LF of 12" DIP, reconnection of water services, pavement restoration, valves, valve markers, landscape restoration, fire hydrants, grout filling abandoned AC lines, driveway and sidewalk restoration


The Challenge:

Tackling a comprehensive infrastructure upgrade, T&J Industries was entrusted with installing new 8" and 12" Ductile Iron Pipes along Thompson Mill Rd in DeKalb County. This ambitious project encompassed multiple elements, including intricate pipe installations, reconnection of services, meticulous pavement and landscape restoration, and the integration of vital utilities.


Our Approach:

Understanding the complex nature of the project, our team approached it with meticulous planning and execution. With a commitment to adhering to industry standards, safety protocols, and efficient project management, we set out to deliver a seamless and comprehensive solution.


Ductile Iron Pipe Installation:

Our skilled technicians methodically installed a total of 10,760 LF of Ductile Iron Pipe. This included the precise placement of 710 LF of 8" DIP and 10,050 LF of 12" DIP, ensuring accurate alignments and secure connections to guarantee a robust water distribution system.


Infrastructure Integration:

Beyond pipe installation, our team undertook the intricate task of reconnection of existing water services, installation of valves and valve markers, and incorporation of fire hydrants. The integration of these critical components ensured the water infrastructure's reliability and functionality.


Restoration and Enhancement:

Recognizing the importance of preserving the road's functionality and aesthetics, our team meticulously executed pavement saw cutting, restoration, and landscape rehabilitation. Driveway and sidewalk restoration were also part of our comprehensive approach to ensure minimal disruption and enhanced community infrastructure.


Client Satisfaction:

The successful execution of this multi-faceted project garnered praise from our client. They expressed satisfaction with our ability to manage every aspect of the installation, from pipe laying to restoration, while adhering to timelines and ensuring a high level of quality.


Conclusion:

The Thompson Mill Rd project showcased T&J Industries' capability to handle complex infrastructure initiatives. Our commitment to excellence, precision, and comprehensive project management enabled the successful installation of 8" and 12" Ductile Iron Pipes, reinforcing water distribution, and enhancing community infrastructure in DeKalb County.




By Zackary Murray 07 Aug, 2023
Case Study: Seamless Upgrade of Water Infrastructure for Delcourt Project
By Zackary Murray 07 Aug, 2023
Case Study: Swift Water Main Repair and Asphalt Restoration
Share by: